Project

General

Profile

Actions

Bug #47308

closed

rgw:lc: fix (post-parallel) non-current expiration

Added by Matt Benjamin over 3 years ago. Updated over 1 year ago.

Status:
Resolved
Priority:
Urgent
Assignee:
Target version:
-
% Done:

0%

Source:
Tags:
backport_processed
Backport:
octopus, nautilus
Regression:
Yes
Severity:
3 - minor
Reviewed:
Affected Versions:
ceph-qa-suite:
Pull request ID:
Crash signature (v1):
Crash signature (v2):

Description

Due to an error in mtime propagation to the wp-work pool--which is via LCOpRule--non-current expiration actions always succeeded, so removed non-current versions at the first expiration check, not after the required number of days.


Related issues 2 (0 open2 closed)

Copied to rgw - Backport #47463: nautilus: rgw:lc: fix (post-parallel) non-current expirationRejectedMatt BenjaminActions
Copied to rgw - Backport #47464: octopus: rgw:lc: fix (post-parallel) non-current expirationResolvedMatt BenjaminActions
Actions

Also available in: Atom PDF