Feature #1210
closed
qa suite: schedule nodes and run suite in parallel
Added by Sage Weil almost 13 years ago.
Updated almost 13 years ago.
Description
extend or wrap teuthology-suite to schedule the right number of nodes for each test and run them in parallel. probably want a max node count to avoid eating up the whole cluster when it runs.
- Translation missing: en.field_position set to 712
- Tracker changed from Bug to Feature
- Translation missing: en.field_position deleted (
715)
- Translation missing: en.field_position set to 27
- Translation missing: en.field_story_points set to 5
- Translation missing: en.field_position deleted (
33)
- Translation missing: en.field_position set to 20
- Assignee set to Josh Durgin
- Status changed from New to Resolved
Done in 85c24bda7f67768dcbd6a75a7ac92ea38b88e1e1 and d1eb9cef38455db149751d0d5b399be36868fdc7 of teuthology.git.
Also available in: Atom
PDF