Project

General

Profile

Feature #1210

qa suite: schedule nodes and run suite in parallel

Added by Sage Weil about 8 years ago. Updated about 8 years ago.

Status:
Resolved
Priority:
Normal
Assignee:
Category:
qa
Target version:
Start date:
06/21/2011
Due date:
% Done:

0%

Source:
Tags:
Backport:
Reviewed:
Affected Versions:
Pull request ID:

Description

extend or wrap teuthology-suite to schedule the right number of nodes for each test and run them in parallel. probably want a max node count to avoid eating up the whole cluster when it runs.

History

#1 Updated by Sage Weil about 8 years ago

  • translation missing: en.field_position set to 712

#2 Updated by Sage Weil about 8 years ago

  • Tracker changed from Bug to Feature

#3 Updated by Sage Weil about 8 years ago

  • translation missing: en.field_position deleted (715)
  • translation missing: en.field_position set to 27

#4 Updated by Sage Weil about 8 years ago

  • translation missing: en.field_story_points set to 5
  • translation missing: en.field_position deleted (33)
  • translation missing: en.field_position set to 20

#5 Updated by Josh Durgin about 8 years ago

  • Assignee set to Josh Durgin

#6 Updated by Josh Durgin about 8 years ago

  • Status changed from New to Resolved

Done in 85c24bda7f67768dcbd6a75a7ac92ea38b88e1e1 and d1eb9cef38455db149751d0d5b399be36868fdc7 of teuthology.git.

Also available in: Atom PDF