Actions
Feature #63302
openAbility to rebuild a point release
Status:
New
Priority:
Normal
Assignee:
-
% Done:
0%
Source:
Tags:
Backport:
Reviewed:
Affected Versions:
Description
If we need to introduce a last-minute change or revert a PR in the point release (e.g. 17.2.7) that was already built via the MultiJob Project ceph form in jenkins, currently, we can't easily reuse the same tag version.
We need to be able to do so.
No data to display
Actions