Project

General

Profile

Actions

Feature #11531

open

Add ability to limit number of nodes used by a particular run

Added by Yuri Weinstein almost 9 years ago.

Status:
New
Priority:
Normal
Assignee:
-
Category:
-
% Done:

0%

Source:
Q/A
Tags:
Backport:
Reviewed:
Affected Versions:

Description

Currently teuthlogy-suite schedules all jobs and also allows to increase priority of a run.

For huge suites e.g. rados (~3.4K jobs) it means that if such a suite scheduled, no other suites will be able to run until rados (as an example) is not completed.

I suggest to consider a new feature, which would allow to specify a number of nodes to be used by a particular suite. Then in an example with rados, it would be allowed to use say 50 nodes (if so specified), instead of total amount of nodes available in a lab, and so permit other suites to run in paraller.

No data to display

Actions

Also available in: Atom PDF