Project

General

Profile

Actions

Tasks #10501

closed

giant v0.87.1

Added by Loïc Dachary over 9 years ago. Updated almost 9 years ago.

Status:
Resolved
Priority:
Low
Assignee:
Target version:
-
% Done:

0%

Tags:
Reviewed:
Affected Versions:
Pull request ID:

Description

integration

teuthology run commit:6b08a729540c61f3c8b15c5a3ce9382634bf800c (february 2015)

  • waiting :
  • OK : rgw, rados, rbd
  • Not OK :

teuthology run commit:db194755a40001bd92ef14385a43f737e1ad002a (january 2015)

QE validation

The following suites were scheduled:

Actions #1

Updated by Loïc Dachary over 9 years ago

  • Description updated (diff)
Actions #2

Updated by Loïc Dachary over 9 years ago

  • Description updated (diff)
Actions #3

Updated by Loïc Dachary over 9 years ago

  • Description updated (diff)
Actions #4

Updated by Loïc Dachary over 9 years ago

  • Description updated (diff)
Actions #5

Updated by Loïc Dachary over 9 years ago

  • Description updated (diff)
Actions #6

Updated by Loïc Dachary over 9 years ago

  • Description updated (diff)
Actions #7

Updated by Loïc Dachary over 9 years ago

  • Description updated (diff)
Actions #8

Updated by Loïc Dachary over 9 years ago

  • Description updated (diff)
Actions #9

Updated by Loïc Dachary over 9 years ago

  • Description updated (diff)
Actions #10

Updated by Loïc Dachary over 9 years ago

  • Description updated (diff)
Actions #11

Updated by Loïc Dachary over 9 years ago

  • Description updated (diff)
Actions #12

Updated by Loïc Dachary over 9 years ago

  • Status changed from In Progress to Rejected
Actions #13

Updated by Loïc Dachary over 9 years ago

  • Status changed from Rejected to In Progress
Actions #14

Updated by Loïc Dachary over 9 years ago

Josh would like

to be added. Also run the tests with machines with more RAM the next time to avoid some errors.

Actions #15

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)

update the inventory

Actions #16

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)

update the inventory with information discovered by following cherry pick references. Add to the display of a list of a commits links to commits that were cherry picked (both direction).

Actions #17

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)

fix references to tickets

Actions #18

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)

add to each commit the release tag it belongs to

Actions #19

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)

cleanup redundant entries

Actions #20

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)

remove more redundant information

Actions #21

Updated by Yehuda Sadeh about 9 years ago

I'd drop 10329, 10334 from the backport.

Actions #22

Updated by Loïc Dachary about 9 years ago

updated the corresponding issues, thanks !

Actions #23

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)

update inventory to reflect issues / pull requests / git evolution

Actions #24

Updated by Loïc Dachary about 9 years ago

List of rgw issues that need backporting, from Yehuda.

- 9918  RGW-Swift: SubUser access permissions, does not seems to workminor
- 10103 swift tests failing
upgrade:dumpling-firefly-x:parallel-next-distro-basic-multi run
- 10471 rgw: metadata sync doesn't create subusers correctly
- 9254 rgw: civetweb requires explicit \r\n for http headers
- 9478 Incorrect content type in response header
- 9479 ETag is not included in the XML response to put object copy
operationminor
- 9877 In some cases it's possible for rgw to segfault on http COPY
- 5595 object has a Content-Type, but its content_type property is
not shown in Swift object enumeration
- 9907 Normal radosgw-admin: can't disable max_size quota
- 9973 Validation of Swift DLO manifest object ETag doesn't match
OpenStack Swift behavior
- 10307 rgw: setting bucket attributes (swift POST on bucket)
sometimes failminor
- 9587 ceph-radosgw sysvinit script on EL6 cannot set ulimit
Actions #25

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)

replace inline inventory with git backed wiki

Actions #26

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)
Actions #27

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)
Actions #28

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)
Actions #29

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)
Actions #30

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)

update rgw run result

Actions #31

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)

sort failed rados runs

Actions #32

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)
Actions #33

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)
Actions #34

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)

analyze dead logs

Actions #35

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)
Actions #36

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)
Actions #37

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)

memorize approvals

Actions #38

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)
Actions #39

Updated by Loïc Dachary about 9 years ago

  • Status changed from In Progress to 7
Actions #40

Updated by Loïc Dachary about 9 years ago

  • Priority changed from High to Low
Actions #41

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #42

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #43

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #44

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #45

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #46

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #47

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #48

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #49

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #50

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #51

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #52

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #53

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #54

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #55

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #56

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #57

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #58

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #59

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #60

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #61

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #62

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #63

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #64

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #65

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #66

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #67

Updated by Yuri Weinstein about 9 years ago

  • Description updated (diff)
Actions #68

Updated by Loïc Dachary about 9 years ago

  • Description updated (diff)
  • Status changed from 7 to In Progress
  • Assignee changed from Loïc Dachary to Sage Weil
Actions #69

Updated by Loïc Dachary about 9 years ago

  • Status changed from In Progress to Resolved
Actions #70

Updated by Loïc Dachary about 9 years ago

  • Project changed from Ceph to Stable releases
Actions #71

Updated by Loïc Dachary about 9 years ago

  • Subject changed from release giant v0.87.1 to giant v0.87.1
Actions #72

Updated by Loïc Dachary about 9 years ago

  • Target version set to 455
Actions #73

Updated by Loïc Dachary almost 9 years ago

  • Target version deleted (455)
Actions

Also available in: Atom PDF