Project

General

Profile

Actions

Feature #1210

closed

qa suite: schedule nodes and run suite in parallel

Added by Sage Weil almost 13 years ago. Updated almost 13 years ago.

Status:
Resolved
Priority:
Normal
Assignee:
Category:
qa
Target version:
% Done:

0%

Source:
Tags:
Backport:
Reviewed:
Affected Versions:
Pull request ID:

Description

extend or wrap teuthology-suite to schedule the right number of nodes for each test and run them in parallel. probably want a max node count to avoid eating up the whole cluster when it runs.

Actions #1

Updated by Sage Weil almost 13 years ago

  • Translation missing: en.field_position set to 712
Actions #2

Updated by Sage Weil almost 13 years ago

  • Tracker changed from Bug to Feature
Actions #3

Updated by Sage Weil almost 13 years ago

  • Translation missing: en.field_position deleted (715)
  • Translation missing: en.field_position set to 27
Actions #4

Updated by Sage Weil almost 13 years ago

  • Translation missing: en.field_story_points set to 5
  • Translation missing: en.field_position deleted (33)
  • Translation missing: en.field_position set to 20
Actions #5

Updated by Josh Durgin almost 13 years ago

  • Assignee set to Josh Durgin
Actions #6

Updated by Josh Durgin almost 13 years ago

  • Status changed from New to Resolved

Done in 85c24bda7f67768dcbd6a75a7ac92ea38b88e1e1 and d1eb9cef38455db149751d0d5b399be36868fdc7 of teuthology.git.

Actions

Also available in: Atom PDF